Tuesday, April 7, 2015

The Bathroom!

With the bathroom walls finished, it was time to paint this week.  Amazing how a bit of white paint can make a space feel much bigger than it actually is.  Quite a few little things also got a coat of paint.  For example, the composting loo got another coat, the tub platform, the trim in the kitchen, the ends of the loft storage, and two little blocks that live at the bottom of the stairs to the loft.  By the end I was looking for anything that I had said to myself that I would "paint it later when I paint the bathroom."  I also got out the blue and painted the flange on the gas line.  So, to the pics!

Bathroom port side before...

Bathroom port side after one coat...
And finished!

With the fixtures...

Bathroom starboard side before...
After one coat...

And finished! Also put up TP holder and the medicine cabinet. I was originally going to build a medicine cabinet, but decided to purchase one instead. Glad I did. 

Put a shelf above the medicine cabinet and a mirror inside. 

I also hung the blinds in the kitchen...

My drill batteries both gave out mid-drilling the drain hole in the tub, so that is at the top of the list for this week.  The countdown to San Diego is at 5 days!  I leave this Friday!  WAHOOOO!!  There will be lots to post next week!  There might even be an extra post or two so as to not overwhelm anybody.  :)




Wednesday, January 21, 2015

Bathroom drawers

And the drawers are happening!

Cut the sides to length while Mom's senior companion was here.

All three drawers cut out and ready to be put together

This is where the drawers will go.  There will be a platform on top of this and the tub will go on top of the platform.

So here are the drawers almost finished. Just need to cut the front of the middle drawer so it fits between the two sides.  The middle drawer is shorter because the tub drain will go in that space.  Also debating if I want to drill holes to open the drawers or use drawer pulls... I'd do seashells but the slides have a pretty stiff stop, so they require a little more umph to get them open.  Don't think shells would last very long. I'll have to see if they loosen up a bit after being opened and closed a bit.

In place...still need a little adjustment, but they fit!

With the tub platform. Not ready for permanent installation yet, but this is what the tub will sit on. 


Saturday, August 2, 2014

Small items

This week I'm feeling like I didn't accomplish much, but a little is better than nothing.  The tub platform started here.

Then added a little height.  In my attempt to not have any holes in the floor I had to find a drain for the tub that was quite low profile.  I originally thought I would need to build the tub platform out of 2x6 in order to accomodate the drain. But then I found a drain that would work with 2x4. Whew.

Then the platform itself is made of leftover chunks of 3/4" plywood.

Here it is complete...now I need to cut the hole for the drain and get the plumbing going. I'm also using shims to create a little bit of a slope for water draining.
Also, when I put in the water input I was still thinking I would be using 2x6 for the platform, so my water intake was too high.  I had to relocate it a bit lower, and fill in the original hole.  Didn't take a pic of that mess, but once it is painted I'm sure I'll be the only one who notices.  Need to get the shut-off valves for the sink and then I can test the water connections and finish that wall. 

The other thing I did this week was paint the trim for the storage loft.  Started with a bit of pale green...

Added some darker green (it is sparkly if you see it in person)...

Then added some blue to the opposite side and blended it all together.

It is difficult to take a picture while attempting to hold the trim in place.  Here is my sad attempt.

The last thing I did this week, which doesn't have accompanying pictures, had to do with the bathtub.  I've had many ideas to create a slope in the tub to facilitate draining.  The first idea I tried failed pretty completely.  I mixed sand with plastidip and spread it around the bottom of the water trough creating a slope toward where the drain will be.  I think it would have actually worked if I had used finer sand, but alas, this week was spent chiseling the dried concoction out of the tub. I think the shims under the tub platform will be enough, but I'm still going to line the trough with a layer of plastidip. I tested the water-tightness and the trough is not leaking, but I want an extra layer of water seal.  So more on that coming up.

Saturday, July 26, 2014

Okay...kitchen tile.

After last week's post stating that I wasn't going to put up the tile, I discovered that the ecobond I've been using can be used on tile. I'm still going to wait on the grout, but I'm so excited how this turned out.

I've also been working on the door...sanding and filling. Need to paint it and then I'll post a pic.  Also started on the platform for the bathtub, but got lazy, so didn't finish it. More of those pics to come as well.  I need to take a little inventory of the stuff I can do without buying anything and make my to-do list for this week.

Saturday, July 19, 2014

Bathroom and starboard kitchen paint

I have to confess that the things coming to the top of the to-do list aren't very logical lately -- namely painting half of the kitchen and 75% of the bathroom. But here is the progress and I'm really liking it.

All taped and ready to start bright and early in the morning.

After the first coat and I wasn't sure that I liked it very much.  I got a little nervous, but...

After the second coat, which I put on too thin, I put on a third coat and liked it a lot better.

Starboard side of the bathroom.

Port side of the bathroom.

And here with the cabinets and fridge back in place, I'm liking it a lot more.  I got out the tile that I'll be using as a backsplash on the other side and accent on this side and I'm REALLY excited about that.  I'm waiting to put up the tile because I want to do that all at once.  We'll see how long my resolve about that lasts though.  I'm doing my best, once again, to finish items for which I have all the materials. I don't have the stuff to finish the tile and I still haven't done anything about the propane plumbing.  Can't finish the other wall until the propane plumbing is finished. But I'm saving all my money for a trip to Italy that I've been planning for a year and a half.  Some unexpected Jeep repairs and a surprise new crown (for my tooth, not for my head) set me back a bit.  Anyway, really excited about my Italy trip AND quite excited about the kitchen as well.

Sunday, May 25, 2014

Plumbing

Got brave today and tackled the plumbing head on.
Here's what I started with.

I wanted to have something semi-solid in the wall so I could hang things on it if needed, so I put a piece of leftover siding up. There are a couple of 2x4's on the other side that I attached the siding to, which will also be the attachment point for the water heater (see photo below).

After the siding came the actual wall covering.

Got all the pex going to the right places ... Well except the kitchen sink hot and cold.  I inadvertently switched them so the hot comes through the wall on the right and the cold on the left, but that is easy enough to attach to the faucet correctly. I even wrote on the pex so I would remember that it is backwards.

So here is the whole kitchen side of the wall.

This is the photo I referred to above. The 2x4's supporting the siding on one side and the water heater on the bathroom side.  

Plumbing for the shower, wall covering for the wet wall.