Tuesday, November 17, 2015

Slowly but surely.

I'm working my way down the punch list, which is a funny term to me.  Every time I think about "punch list" I think it is something that needs to be finished quickly.  Well, maybe I need another term, because my list is NOT getting finished quickly.  So maybe I should call it the hug list, because the best hugs are slow.  I've already gotten side-tracked. Sheesh!

So this week the solar panel got attached to the roof (thanks to Robyn's husband Keith for the extra hands) and the electrical is all hooked up except for three things.  I need to put in the fuses, add a grounding wire/rod, and I need to connect the inverter to the breaker box.  I also need to have an electrician come and check it out before hitting the go switch.

Panel on the roof (still has the protective cover on)

Then the weather decided to go all winter on me, so I moved to an inside project.  The tile in the kitchen is now grouted.  I still want to put a bead of caulk on the bottom where the tile meets the counter, especially on the sink/stove side, but I'll wait a couple of days to make sure the grout is set.   

During

After

Before 
During 
After
Part of me likes it better before grout, but it might just be that I'm used to it that way. 

And finally, I got the Christmas lights started.  Need to pick up one more string.

  
The heater is doing a marvelous job keeping us warm.  And the wind has yet to knock over the house, so we are doing good.

1 comment:

  1. I love this! I am getting the guts to learn how to tile and grout. I'm glad you are warm. Oh, and Yay for Christmas lights!!!

    ReplyDelete