Friday, April 11, 2014

Starboard wall

As I was debating whether to hang the door or put up wall covering, "eeny meeny" determined that wall covering was the very best one that my mother told me to pick...the door was not it.  So here is the beginning...


One section up to the loft joists...

Before the second section...

After the second section.

Almost finished with the third section...

That wire looks so strange hanging out of the wall, but it does have a purpose.  It will attach to the thermostat for my radiant floor, which thermostat is in the interior wall that separates kitchen from bathroom.

Whole wall finished up to the loft joists.  Yehaaaa!

So now it is time to seriously think about finishing up the electrical, and beginning the plumbing.  Electrical will go out the wall on the tongue side with the breaker box and all the electrical paraphernalia being in a box that sits on the tongue of the trailer.  Plumbing, both water and propane, will all live in the port side wall.  

No comments:

Post a Comment